Jeremy KayeProduct Engineer
← Writing
Dev logAgoure

FoodBrain gets rethought, and the new Planner is built through phase 11

A search for a demo app turns into a rethink of FoodBrain, and Phase Runner builds the new Planner through phase 11 in six days.

Jeremy KayeJeremy KayeWeek of Oct 26, 20266 days6 min read

Written by my devlog skill from my Claude Code session transcripts: one entry per workday, headline and summary. Anything marked “inferred” is the log's best guess.

Nov 1
Sun · Day 6

Foodbrain in Claude goes live, and the first real chat leads to three fixes

Phase 9, built the night before, went live once Jeremy turned on Supabase's OAuth server. The branch was merged, three hosted migrations ran, both Vercel projects deployed and 13 smoke checks passed. At 4:49pm Jeremy said "connected": Claude on claude.ai could see the household through 14 tools. The permission check had refused the production migration even after Jeremy's yes. It took a second, explicit "run them."

Then real use. Jeremy shared a chat from the Claude app and asked what to fix before letting it save. That led to shredded chicken counting as cooked chicken, and to a new recipe_add so Claude can save a recipe from text, started by Claude as a side session. Two more sessions ran in parallel in the same checkout: "Add receipt" in History, so a receipt doesn't need a past shop, and clearer name editing on a food. The receipt work was committed. The name editing never was.

Oct 31
Sat · Day 5

Recipe ideas (phase 10) and cook from what's home (phase 11) ship, and phase 9 gets built

Three phases built in one day. The first test after phase 8 found no screen for ideas. Jeremy rejected Claude's one-row fix for a two-source Recipes tab, Recipe ideas above Your recipes, then added cuisine and meal filters. Phase 10 went from 6 to 9 sprints in 25 minutes as the manual steps were cut ("you can do testing via the web version"). phase-builder built it in a side session with every gate passing. At the release Jeremy had the 600-idea limit raised, and the whole pool was tagged for $0.10.

Then "if the user has bread and cheese, they can make a cheese sandwich." Live data showed the top ideas needed about 7 things each. Phase 11, cook from what's home, was planned in six minutes and shipped at 7:44pm, bringing that down to 0.5 things on average. Its release check found more problems, and three side sessions fixed them in parallel. Late in the evening phase 9 was re-planned to put chat before voice, and built in a worktree with an eval scoring 30 of 30. It was committed to its branch, not merged.

Oct 30
Fri · Day 4

Planner goes live on web and Android, and real testing leads to phase 8, shipped by 3am

The day started with phases 1 to 6 coded and nothing live, and with "walk me through all the manual steps." Claude did most of the steps itself, including the private GitHub repo, hosted Supabase, two Vercel projects and 30 migrations. Jeremy handled what needed a personal sign-in. Going live found problems the build gates couldn't see: an API crash on Vercel, broken USDA search, a missing Babel plugin that failed the first Android build, and an API key on an old account that was out of credit. By 8:22pm the app was on the phone, and by 9:55pm the recipe pool held 2,000 recipes.

Jeremy's first real test turned up a missing screen and a confusing idea of what a "meal" is. Six rounds of design feedback led to phase 8, What you can make, which was planned in two minutes, built by 2:32am and shipped at 2:39am. An assistant plan called Tell Foodbrain was rejected the same night and replaced by phase 9, a connector for Claude itself. Shipping then exposed the real miss: Plan showed no ideas on the phone. The fix went out at 2:55am. Nobody has seen it working yet. Times after midnight are early on Oct 31.

Oct 28
Wed · Day 3

Planner phases 2 to 6 get built, with phase 4 in a parallel worktree

Two phase-builder runs went side by side from 1:06am: phases 2 and 3 in the main checkout, and phase 4 in a git worktree with its own Supabase stack. Phase 4 merged at 3:57am with 17 conflicting files, all mechanical, and 746 tests passing. The rest of phase 3 ran with nobody watching until 5:34am. It then sat for nearly nine hours waiting for an OK to commit.

Phases 5 and 6 followed in the afternoon, each in a new session. By 7:37pm phases 1 to 6 were committed on master: 180 tasks, 154 done, 25 MANUAL or deferred and 1 cut, across 132 sub-agents. Nothing was live, and the recipe pool was empty. After 2:18pm, Jeremy typed eight messages, and four of them were about the Whipp app rather than the build. Compare wasn't touched.

Oct 27
Tue · Day 2

A design system gets locked, Planner's design is cut to 4 tabs, and phase 1 gets built

The glass look from Oct 26 didn't hold up after a night away from it. Three alternative directions came back and Beet won: a deep beet-red hero, pink-tinted neutrals and a lime "savings" color. It is now the shared FoodBrain design language, with an idea on the side that each app might get its own vegetable. Then design-planner ran on Planner and drew 14 polished screens that looked good and were wrong. The product plan had been carried over too literally, with prices the app won't know, a shopping schedule nobody keeps, and receipt checks that felt like policing.

The rest of the day went into rebuilding it one area at a time: List, Plan, Kitchen and Recipes, plus two detail screens, four flows and Settings, all approved by 9:33pm. Compare got a real answer to mixed aisles in parallel. phase-planner then turned Planner's design into 7 phases and 39 sprints, and at 10:23pm Jeremy started the project's first phase-builder run, on phases 1 to 6. Phase 1 was committed at 1:01am. The rest of the build is on Oct 28.

Oct 26
Mon · Day 1

Looking for a demo app, finding the rethink instead

The day started with a different goal: find a small, good-looking app to build with Phase Runner for its GitHub page and a demo video. The first pitches were toys, and Jeremy turned them down because a demo should be something genuinely useful. Reddit research was blocked, so the search turned to an existing project instead. That was FoodBrain, which had grown far too complicated.

Instead of salvaging the old app, the session listed what FoodBrain was supposed to solve, then restated it as five problems Jeremy actually hits on every grocery trip. Those went into a Rethink page. Problem 01 became Foodbrain: Planner, planned through nine versions in one evening. Problem 04 became FoodBrain: Compare, small and testable enough to be the Phase Runner demo, and it went through plan, design and phase planning before midnight.

Apr–May
2026 · Day 0

Before the rethink: the first FoodBrain

The first FoodBrain was pitched as a grocery optimization engine that plans meals backwards from cost and fills Instacart carts. Over about six weeks it grew to 18 phases and 75 commits: a Next.js app on Vercel, Supabase, the Claude API, and a Playwright worker on Railway that scraped Instacart storefronts for prices and flyer deals. The design called for four coordinating agents (Orchestrator, Research, Meal Planner, Procurement), and the app grew a sidebar copilot with long-term memory, pantry photo capture, a food freshness system, a food icon system and several rounds of grocery list redesign.

It worked in parts, but it was solving a shopper Jeremy isn't. He shops in person with paper receipts, so scraped Instacart prices were never his prices. Every money feature leaned on the scraper, cron jobs, a price cache and a store-pair optimizer. Weekly AI meal plans needed approve-and-regenerate flows, and pantry counts drifted. The last commit was May 27. Five months later the rethink kept two things, the food icons and the freshness system, and started everything else clean.

Jeremy Kaye
Written by Jeremy Kaye
PRODUCT ENGINEER · LOS ANGELES, CA
Subscribe