Jeremy KayeProduct Engineer
← Writing
Dev logAgoure

Fixes from a phone, one can-make rule, and What you can make as rails

Fixes sent from a phone through cloud sessions, one can-make rule, What you can make redrawn as rails, and five more phases shipped.

Jeremy KayeJeremy KayeWeek of Nov 2, 20266 days5 min read

Written by my devlog skill from my Claude Code session transcripts: one entry per workday, headline and summary. Anything marked “inferred” is the log's best guess.

Nov 8
Sun · Day 12

Sort and filter (phase 16) and From your plan on Kitchen (phase 17) get planned, built and shipped

Two full plan-to-ship loops in one day, each started from something Jeremy noticed while using the app. In the morning, a List fix turned into an app-wide question about filters. A forked session gave the answer, one Sort and filter button and sheet, using Raindrop's sort panel as the reference. It went from mockup to rejection, fix, phase plan and a phase-builder run in a worktree, and shipped as PR #35 by 12:17pm. Jeremy aborted the browser test to save time, so phase 16 shipped with no browser check.

In the evening, after a real plan, list, shop and receipt run, Jeremy found that his picked meals had nowhere to live once the shop was done. From your plan was mocked above What you can make on Kitchen, and that section gets retitled "What else you can make" while a plan is active. It became phase 17, ran in a fresh session in a second worktree, and was live by 7:43pm. The wave test caught a real bug that verify had passed. Every phase 17 task was marked done, including a phone check that was never run.

Nov 7
Sat · Day 11

Foodbrain in Claude stops asking permission, List gets rename and Already have it, and duplicate foods get merged

A day of fixes driven by using the app, with no Phase Runner skill at all. It opened with the connector built in phase 9 asking for permission or a "save" on every request. Claude traced that to three confirmation layers from phase 9, flagged it as a reversal of the confirmation-before-write rule, and Jeremy chose to lift it: plain requests now save directly, and Undo is the safety net. Then came List rename and "Already have it" in the app and in chat, list_remove, and a Kitchen refresh fix. That was eight PRs (#26 to #33) merged by 9:49pm.

In the evening, three sessions ran at once. One merged 52 duplicate food pairs into one record per real food with aliases, following a four-step brief Jeremy wrote himself (investigate, plan, dry run, implement). Another restyled recipe cards as open, Raindrop-style cards with no source site. A third gave chat a way to edit a recipe's ingredient lines. Two of them shared one checkout, and a branch switch put the wrong commits on PR #32. Fixing that needed a force-push that Jeremy had to run himself.

Nov 5
Thu · Day 10

One can-make rule (phase 13) ships, and What you can make is redesigned as rails (phase 15)

Jeremy noticed that Kitchen's What you can make and Recipes' Ready now disagreed. They were two engines with two rules: one allowed a single missing thing, the other none. The fix was one rule for both, specced on the canvas, planned as phase 13, built by phase-builder in a short-path worktree with no failed gates, and shipped at 5:33pm. Twelve minutes later Jeremy called it wrong. The data now matched, but the screen still showed the same three meals, one per section.

That turned out to be a design problem, not a data one: "it's a design issue with the What You Can Make screen." What you can make was redesigned as rails like Recipes (Use it up, Ready to eat, then meals by time of day), with Just need reduced to a banner. A parallel branch-cleanup session had already used the number 14 for the curated recipe pool plan, so the rails plan became phase 15. It ran overnight in a fresh session and merged at 10:46am on Nov 6, which was the only FoodBrain work that day.

Nov 4
Wed · Day 9

Phase 12 makes Plan the next shop and Recipes one library, built in a cloud session

Every line of this day was written in Claude Code cloud sessions, using the setup built on Nov 3. None of their transcripts are on the PC, so this entry comes from git commits and PR descriptions only. The main piece was phase 12, "Plan is the next shop, Recipes is the library." The app now opens on Plan, which shows what's picked and what it still needs, a few suggestions, and Lately (what was made or bought recently). Recipes became one library of your recipes and new ones, in sections like Kitchen's. It went in as one commit per sprint (12.1 to 12.6) and merged as PR #16 at 5:26pm.

Around it, six other PRs cleaned up the recipe pool: ideas ranked by each site's rating, only real meals in Recipes, a quality gate that keeps non-meals and low-rated recipes out, and Smitten Kitchen and Love and Lemons dropped as sources (opened here, merged Nov 5). Phase 12 never got a phase file in planner/docs/phases, because a cloud session can't reach that folder. That's why the numbering jumps from 11 to 13.

Nov 3
Tue · Day 8

A phone-to-fix loop with cloud sessions, 13 PRs through it, and drawn pictures for simple meals

The morning built the loop Jeremy described: "if I use claude to build foodbrain, and I can use foodbrain through claude, whenever i encounter an error or change that I want to make, i can just ask you to fix it and then update the app." He'd tried it from the phone already, and the cloud session had no database. There was no new dev database. Each cloud VM now starts its own local Supabase stack, sessions read production only, and migrations run on merge through a GitHub workflow that uses the database URL alone. A smoke test passed at 11:00am, with the stack up in about 66 seconds and 2,146 tests passing.

Then it got used. Between 12:37pm and 6:20pm, 13 PRs from six cloud sessions were merged. They covered Kitchen sort and filter, phone updates on merge, Basics in place of Always at home, formula meals, smoother Recipes, cloud Android builds and confetti with Undo after Made it. None of those transcripts are on this PC, so this part comes from git. In the evening, a local session used ComfyUI to draw 86 dish pictures for meals that have no photo, after four rounds of style feedback. They shipped as PR #14 at 9:06pm.

Nov 2
Mon · Day 7

The Rethink page gets the Beet look, and the old FoodBrain's Railway worker is shut down

A light day, about 40 minutes of FoodBrain. The FoodBrain Rethink page, the five-problem overview from Oct 26, was restyled in Beet. It still had the glass look and stale status. Its copy was then brought up to date: Planner 10 of 11 phases built, Compare not started. Separately, Jeremy suspected the old FoodBrain was still charging him. It was. The idle Railway worker from the first app was confirmed unused for 30 days, deleted, and its Hobby plan cancelled.

Jeremy Kaye
Written by Jeremy Kaye
PRODUCT ENGINEER · LOS ANGELES, CA
Subscribe